Pages

Tampilkan postingan dengan label joinery. Tampilkan semua postingan
Tampilkan postingan dengan label joinery. Tampilkan semua postingan

Minggu, 10 April 2016

Best selling wood projects - New Life for a Beautiful Old Table

Best selling wood projects

Best selling wood projects


The job I have just complete was to re-build an old table. This beautiful oval extending table is a family heirloom - but has had a hard life too. The owner approached me, keen to have the table repaired and the missing extension leaf replaced. So I picked up the table from their home and have begun the rebuilding task.

The two halves of the top are removed here, showing the damaged frame.

The damage was extensive - more than I realised when I put the table in the back of my ute. It was when I started to investigate the table closely in the workshop that the true situation became evident. See the pic above! A jarrah table with cabriole legs, the extending mechanism is of the winding type with a crank handle. The end rail which houses the winding "socket" was smashed into 4 pieces. Of the 8 primary joints in the frame, 7 of these were broken. In most of these, the tenons were broken off inside the legs.

Rebuilding the Table Frame.

The table had been repaired before, long ago. However these repairs had failed too, so I pulled these joints apart as well, removing the metal brackets used in that old repair. These tenons had been broken also.

This pic shows the top of a leg, showing a typical broken tenon. The other broken tenon I have removed already from the mortise which has been cleaned out.
I have made two new ends for the table frame - as one was smashed into 4 pieces and the other was split through the middle and with the tenons missing on each end.
This pic shows one of the side rails with the tenon smashed off it. Rather than replace this whole side rail, I cut out a piece of it and housed in a new piece which would include the missing tenon. The next pic shows the result...

This side rail had a new section added which included a new tenon. Here the screws are being added to reinforce the glued lap joint. Note the slotted countersunk screws being used, in keeping with the original table. How long since you saw Nettlefords 9 gauge screws, Woodies?

Pulling apart the table gives away the secrets of how it was made. It was obviously made in a workshop environment, a combination of machine work and hand work. It is clear dado blades in a table saw were used to cut the table button grooves and the sliding mechanism grooves in the long side rails. A table saw was used for cutting one cheek of the tenons, and hand sawing cut their shoulder. The back face of each tenon was the back face of the rail. A mortising borer (probably on the end of a table saw spindle I reckon) was used to cut the mortises in the legs, as evidenced by the round ends in the mortises. Hide glue was used to assemble the table - most of which had held despite the abuse - hence the mortises had snapped off rather than the glue giving way. The table buttons were fashioned by hand, and yellow pine angle blocks were used to shore up the inside corners of the frame. Glued and nailed. The glue on these blocks had failed on many of the joints - it was the nails which mostly held these in place. The jarrah had been stained to a dark walnut colour on the visible faces. The curved corner wings of the cabriole legs were glued and nailed in place, with a dowel also used with each of these on the far end of the table. Very simple construction and mechanism. I will add new corner blocks to the 7 joints that I rebuild, as well as replacing the two ends of the frame.

One of the re-built corners around the leg. With the top corners of the cabriole "wings" broken off and missing, you can see here how I am gluing in small blocks which I will then shape to complete the curves at the transition point.


This pic shows one of those missing top corners of the cabriole "wings" now in the process of being shaped to complete the nice flowing transition to the leg.


The table frame here is rebuilt and prepared ready for staining and finishing. I moved the frame out of the workshop into the patio, where there would be better light for the staining and finishing. To get the new jarrah to match the old finish, after some trials I used a walnut flavoured wiping stain to get the colour up and then applied several coats of shellac over the lot. This was followed by a dark furniture wax -with a hint of walnut flavour in it as well.

Here the frame is being re-attached to the two halves of the top. As I was using only slotted traditional wood screws, the good old "Yankee" spiral ratchet screwdriver came in very handy for fixing the table buttons. They still can outclass the cordless drill/driver for screwing in slotted screws. When repairing the frame, I often used a slotted bit in a brace, for much more purchase. Wonderful!
The extension mechanisms threaded rod needed straightening, so I did that as best I could using a metal vice and an anvil. Much better. The threaded nut is cast brass or bronze, with the manufacturers inscription: J & A, Fcray, V. I did a bit of googling for info about "J&A" in Footscray Victoria, but I have not found any info at all. Does anyone out there know anything about this foundry or manufacturer? It might help to date the table... At this stage I am guessing that the table was made in Perth sometime between 1900 and the 1920s.

Making the new Extension Leaves.
Now that the rebuilding of the table has been completed, it was time to get onto making the missing extension leaves. The table extends about 18 inches to the limit. Instead of making one wide leaf (which are a pest to store) I made two narrower leaves, as these are easier to store, not too heavy, and more versatile.

The challenge with these jobs is obtaining the right material to match the old. Lots of old furniture was made from timber finished to 7/8ths of an inch in the old language (22mm). Somewhere along the way, someone out there in the timber industry decided that 1" rough sawn timber would be dressed to 3/4" (19mm). The standard dressed sizes for jarrah in Western Australia for decades has been ex- 1" to 19mm and ex-1 1/2" to 30mm. Its a lot of wastage when you think about it, but I guess that reflects one of the down sides of high volume mechanisation. The only way to get 22mm thick dressed timber is to dress it yourself - either from 25mm rough sawn stock or to boil down 30mm dressed sticks - even more wastage and very expensive!

However there is one more alternative. Salvaged timber. I frequent my local salvage yard where I often buy timber which I recycle, and keep an eye out for those rare goodies which come in from time to time. Some months ago, I came across some old shelving which had come out of an old house which had been demolished. At the time I had snapped it up, as these were jarrah boards 2.7m long and 250mm wide. I bought 2 sticks at 22mm thick and 2 at 33mm. So one of these 22mm sticks gave me the timber I needed to make the two leaves. Lucky I hadnt used it already! Fancy that - 7/8" thick nice wide boards and about the same vintage as the table! Just perfect.

Sorry, there are no photos of the making of the leaves - I was too focused on what I was doing to remember to take any pics!

Making the new leaves was easy. Trying to match the colour was a real challenge... but then, it almost always is with restoring old furniture. I had several goes with a range of different stains but just couldnt get a perfect match. Three times I got the finished polish on and decided it wasnt good enough - so had to take it all off and start again! What I have settled with is a bit reddish in tinge, but actually it looks really nice in the centre of the table. I will never guarantee to be able to do a perfect colour match - for good reason!

We had a very nasty storm the other day in Perth. At least $100 million in damages across the city. At the time we had moved the table into our house from the workshop area, to make sure it would be safe. The pic above shows the table where I left it in our living area - completed and waiting to be returned to the customer. The rags under the feet are to protect the jarrah floor from drag marks and to reduce friction when the table is extended and wound back in again.
This next picture shows the table with the leaves removed and sitting on top.




What a delightful privilege has been to give new life to a wonderful old piece of furniture. In many ways, furniture and people have a lot in common...

Job done - and the tables story continues to unfold...

The story of the table is echoed in the way that it has been made, the battle scars and stains in the top and the frame, the marks of the earlier repairs which were made to it long ago, the old-looking new extension leaves, the memories embedded in it of the family which have passed it down the line, and the new structural repairs which I have just undertaken. This and more all adds up to create the story of the table - which gives it its character and identity.

I am told that the family are looking forward to gathering around the table to have morning tea on the morning I will be delivering it back to its proud owners. A new chapter of the tables story begins...


Best selling wood projects
Read More..

Kamis, 31 Maret 2016

Best selling wood projects - Giant Jarrah Joinery!

Best selling wood projects

Best selling wood projects


The job I have at the moment is to make and install some jarrah joinery for a customer in Kewdale. It is many years since I did some sliding doors, but these doors are all sliders. A new spacious bathroom is being added onto an existing house. My task is to supply three things:
1. a jarrah lining and flyscreen frame for the toilet window,
2. a jarrah frame housing a single sliding jarrah framed glass door, a sliding jarrah fly door, and a fixed glass panel. The opening size is approx 2.1m x 1.8m.
3. a large jarrah frame housing a pair of sliding jarrah framed glass doors with fixed glass panes either side. The opening size is 4.2m x 2.7m. It fills the whole end wall of the extension. It is a giant!

First, the smaller tasks...
My able assistant Chris, a Year 11 student doing Work Expereince with me, is here helping trim the stiles of the smaller frame. The brickwork was pretty dodgy, with the opening a parralelogram rather than a rectangle! So we had to have several goes at the fitting process. 

The end result - the smaller frame fitted and fixed in the opening. Now I have to get on with the making of the door and the fly door. Meanwhile the plasterers and tilers can get on with their bit now the frame is in. The beads also have to be fitted ready for the glazier. The customer will be applying the polish to the joinery. 

Chris is shown here fitting the lining in the opening for the toilet window. He was very pleased with himself, as this was his first day on board with me. He would like a cabinetmaking apprenticeship. While the window joinery is aluminium, the lining, inner fly screen frame and architrave will all be made from jarrah to disguise the nasty aluminium!  The walls around will all be tiled, floor to ceiling.

That was easy - now for the big one!

This big piece of joinery was much too big for my workshop. I had enough trouble machining up the 4.2m long head and sill in the confined space! The weight of these, and the 2.7m long stiles and mullions proved to be just hard work! Funny how I often said to myself: "I must be getting too old for this!" Mind you, the fact that I have been battling with the nasty flu while I was making this did not help my sentiments at the time! Once I had made the components, I did a "dummy-run" and assembled the frame in my backyard to make sure it all went together OK.

My wife Rosemary did have to ask me how I was going to shift it when it was built around the tree!
Just as well I had only screwed it together, eh? 4.2m x2.7m is too big to get out of my yard, let alone carry it on my ute. So having found that it went together like a dream, I pulled it apart and delivered the components ready to be assembled on site. 

 Next day, Chris and I assembled the frame on site ready to install it. This time it was all nailed together properly. After careful preparation of the opening and checking that it would all fit OK, we lifted the frame into the opening with the help of 3 other people who were on hand at the time. I confess I was pleased but very relieved when it was successfully standing in the opening! We then fixed it into position. Several days previously I had fitted timber fillets into the cavity either side of the opening. This enabled us to pack and nail the frame into its final position. It is solid.

Here it is. The giant frame in its new home. Now I have to get on with making the doors. With the frames in place, now the plasterer and tiler will be able to get on with their tasks.

Making the Doors.
There are 4 jarrah framed doors to make, including a large matching pair of sliding doors, and a single sliding door with a corresponding single sliding fly door. There is also a small jarrah fly screen frame to make and install in a window. The four sliding doors are all to be of traditional mortice and tenoned construction. They will each house a single piece of 6mm laminated clear glass. My job is to supply and hang the doors raw, with beads fitted. The customer is to apply the finish, and a glazier will supply and fit the glass.

For a cheapie, this little morticing machine is a ripper. It has its limitations, but I find it quickly and cleanly chops nice square through-mortices when I come in from both sides. There is a bit of slop in the X-Y traverse, but I compensate for this by small adjustments in use to make sure I am working within my scribe lines. 

The tenons and haunches are shown here being cut for one of the bottom rails. This is done using a bandsaw and an english bow saw. The waste cut from the tenons are used to make the wedges.  


The fitting of each joint is done carefully to ensure all the shoulders come together and the tenons are a nice neat fit in the mortices. Here I am using a No.78 rebate plane to trim the tenons and shoulders. Often I use a No.140 plane, but with these wide rails I find the larger base plate on the 78 works very well. It takes some time, but getting the fit just right is essential to ensure the glue-up takes place without a hitch.

This pic shows a view of the bottom rail during the glue-up just after I have driven in the wedges in alongside the tenons. While the through mortices are chopped square to stiles, an angled extension to the mortices on the outside edge is chopped with a chisel to take the wedges. The wedges are cut from the waste removed in the cutting of the haunches on the tenons. The result is a joint beautifully pulled up tight and ready for many years of service.


 
Heres the top rail, after being glued and the wedges driven home.
When the glue dries, the protruding tenon ends and wedges get cut off and trimmed flush with a block plane.


More pics to follow as progress on this job unfolds...


Best selling wood projects
Read More..

Senin, 15 Februari 2016

Best selling wood projects - Rebuilding termite eaten joinery

Best selling wood projects

Best selling wood projects


I was recently approached by clients in Northbridge, who live in their 1903 semi-detached cottage. Joe and Annes front door joinery had been eaten out by termites some time ago. The joinery was fairly standard, consisting of a 5 foot long 12" x 3" jarrah sill, jarrah stiles and mullions, headerand transom, with 2 leadlight sidelights, 3 top lights, and 2 wooden panels below the mid-rails.





Assessing the damage.
Amazing little things, termites. They had travelled up the joinery via the softwood beading and mouldings, eating out much of the jarrah transom just above the door, some upper areas of the jarrah mullions and stiles, and a significant portion of the jarrah sill. Most of the leadlight panes were held in place only by many layers of paint which covered the eaten out beading and mouldings.


After removing the security fly door, front door and leadlight panes, I was then able assess the extent of the damage. My task was clear - replace as much of the joinery as possible and rebuild it in situ as it was not going to be possible to remove the whole piece of joinery. I was up for a very interesting challenge!




Fortunately the four mullions/stiles and the header would all be able to be used, as most of the damage was surface damage. The termites had been after the softwood beading and mouldings. However the sill and the transom would need to be replaced, plus the wooden panels and all mouldings and beading.















Replace and rebuild.
First I cut out the sill (no easy feat) and replaced it. The only suitable material I had been able to find was find was a 10" x 3" piece of wandoo. It was heavy! I added a piece of jarrah to make up the width, under the door. The tenons on the bases of the mullions were still in good condition, so I was able to cut the sill to house it around them. The result was a very solid new joint between the mullions and the sill. Nice.












These pics show the sill being chopped out, and the new sill installed.
The next task was to replace the transom. Once this was done, I made new mid-rails and fitted these. Then the bottom rails of the side panels were constructed, and the panels made up and installed.


This pic shows the new transom under construction on the portable bench. There was a lot of hand work to do on site to make and fit the components.

After the refurbished joinery was cleaned up, the leadlight panes were put back in place and the beading mitre cut and nailed in place. Then the finishing mouldings were added around the wooden panels and in other places as required. Beads were added full length down the inside walls, and other finishing touches including sealants were added to hold together the render and mortar which was frittering down the openings adjacent to the joinery.

Re-hanging the security fly door was a challenge, as the opening was now slightly different to what it was when it had been installed. I had squared up the joinery, so there was a bit of trimming and fine tuning to do to re-hang both the security door and the front door. However the net result was a very nice job. It was all as solid as it would have been when the house was built in 1908.





This pic shows one of the completed wooden panels with new mid-rail above, mouldings added, beading completed and leadlight panes re-installed. All old nail holes and surface termite damage have been filled, so its ready for painting. Thats up to Joe and Anne now...

This pic shows the job almost complete. The joinery has been re-built, the security door re-fitted and hung. Now it was just a case of re-hanging the front door and cleaning up.
I am looking forward to seeing it all with a new coat of paint.

Honouring the original makers.
When I do jobs like this, working with old joinery and furniture, I always find myself thinking about the blokes who built the stuff in the first place. It was evident that most of the work was done by hand, including the dressing of the timbers. This was apparent due to the variations in the dimensions of the timber over their length - including the sill and the stiles and mullions. The bottom wooden panels had obviously been added on site by the carpenter/joiners who installed them, as they had used some of the flooring as the bottom panels. The floors are kauri pine, and the termites were not too keen on this. So there was mostly only surface damage to the panels. I replaced these with new jarrah panels. So here we are just over 100 years later - I hope my rebuild of this joinery has done the original tradesmen proud.
New life for damaged material.
After I finished the job, in my workshop I was able to re-use enough of the timber in these panels to make Joe and Anne a beautiful kitchen chopping board with breadboard ends. A nice touch to use some of the old damaged joinery and give it a whole new life again . Now thats a low carbon solution! Timber is a wonderful low-energy high-carbon material which can be re-used again and again for centuries, so long as it does not rot or is not totally eaten by termites!

Best selling wood projects
Read More..

Kamis, 11 Februari 2016

Best selling wood projects - Building a Staircase

Best selling wood projects

Best selling wood projects


It has been a while since I have built a staircase, so I am absolutely delighted to have one to do now as my current major job. There is a lot of maths involved in building stairs, so it is a workout for the brain as well as for the body - the timbers are big and very heavy!

Getting started - the planning.
My first task was to plan the staircase and start doing the maths after obtaining the essential measurements of the empty stairwell space in the house. I did a heap of drawing and presented a few options, and my customers opted for a staircase with winders - that is, there is an upper and lower straight flight with radiating treads around the corner newell post mid way up. This would increase the size of the pantry underneath the upper flight, which was their reason for chosing this option.

The maths in a staircase are really interesting, to make it egonomically right. Ever been on stairs which dont feel right? Heres how well get this one right: The height difference between the top and bottom floors on this job is 2655mm (the total Rise), and the plan shows 15 treads. This means the "Rise" height (the height of each step) must be 177mm, regardless of the style or configuration of this 15 tread staircase. The vertical surface at the back of the tread is called a "Riser". The length of the step (from riser surface to riser surface) is called the "Going". Long ago allegedly someone determined that it takes twice as much energy to walk upwards as it does to go forward. Hence the relationship between the Rise and the Going is determined by a formula, these days called "The Rule of 585":
  GOING + (2 x RISE) = 585mm (to a maximum of 625mm).
Hence for this staircase the maximum Going on the straight flights would be 250mm and the minimum would be 231mm. Given the requirements from my customers to maximise the size of the pantry underneath, we opted for a 230mm Going in addition to the Winders around the bend. With a 30mm overhang of the tread beyond the front of the riser, this would give a total tread depth from front to back of 260mm. Armed wth this information, I created a set-out board - a full size drawing of the detail, to determine the various angles.

Time to play with timber!
My customers live in a house in Augusta with lots of jarrah, so they wanted something different, a lighter colour. The opportunity came up to purchase some American White Ash for a very good price, so that is the timber I am working with for this job. Interesting stuff, I understand it is what is used for baseball bats in North America.

The next task was to sort through the stack of rough sawn timber. The pic above shows some of the sticks on saw stools during my sorting process. All 2" thick, the widths varied from 14" to 6". Sorting through the pack involved seeking out the imber suitable for the stringers, treads, etc. The sticks which had a "wind" (propeller twist) I docked to length for making treads and other short components. The straighter sticks I left that way and pre-dressed. I then spent 4 hours machining, on the buzzer and thicknesser at the Perth Wood School. I was kindly given access to their gear, including the 12 inch long bed buzzer, so this enabled me to dress the first batch of timber. My 6" buzzer is too small to handle these big sticks! I pre-dressed all of the sticks except for the last 12 which I have left rough sawn, which I will access later as I need them.

 This pic shows the pre-dressed timber in the back of my ute on my arrival home. The longer ones here are 2.5m long, which was the length of all the original lenghts. Now the work really starts!

Making the Newel Post.
In my planning for this staircase design and construction, I decided to laminate up an octagonal newel post. In this way the winding treads on the bend will each radiate out from a flat face on that rising bend. The octagonal post will have a 170mm diameter up to a point above the widers where it will morph down into a 100mm diameter turned cylinder. One lamination will be missing below a certain point inside the pantry, inorder to house the chest freezer at the back of the pantry.

   You can never have enough cramps! This glue-up involved 50 cramps and 4 lamination layers, making a post just over 3.2m long.

Once the cramps were removed the next morning, I squared up one edge to the faces. This is one massive stick, so the easiest way to square the post was to shoot one edge by hand (using the trusty Stanley No.7). I then lugged it to the thicknesser and completed the squaring up and dimensioning by sticking it through the machine. Handling this stick on my own, I was sweating!
Another view of that beautiful No7 jointing plane. My Dad was given this by his father when Dad commenced his apprenticeship in 1945. Last year Dad handed it on to me ... I am so priveledged to have custody of this wonderful tool with such a significant history. Nice one, Dad! Thank you.

The next stage after completing the squaring of the post to 170mm was to turn it into an octagon. To achieve this, I cramped a straightedge along each of the 4 faces in the right possie to use this as a guide for my trusty 9 1/2 inch makita power saw. This worked a treat to accurately remove the waste. Once again the No7 was used to shoot two of the new faces at 45 degrees to the original square faces, and then the stick was put through the thicknesser several times carefully to create an equal sided octagon at 170mm from face to opposite face. If I wasnt stuffed before, I certainly was now! This beast is damn heavy!!

With the machining and dimensioning completed, the marking out of the housings for the treads and risers was commenced on the newel post. This pic shows the marking out in progress.
Meanwhile, as the newel post was being created I was also working simultaneously on making the treads and stringers. To create the 42mm treads which are 260mm deep, I need to glue up most of the treads, using a butt joint with a double spline in the joint. The splines are  of 6mm thick plywood. In the foreground of this pic there is a pair of treads in the cramps still.


As mentioned earlier, the top section of the newel post will be turned down to around a 100mm diameter. How to do this? Well my solution has been to create what you might call a temporary long bed lathe. With the post being 3.2m long, the way I created this was to use about 40 cramps, a few big blocks of wood, and a bunch of long sticks out of my timber racks. When I made the Hill 60 columns, I used a similar method. It works well. By using cramps and the whole thing constructed on a couple of pairs of saw stools, when I have finished with it the cramps will come off and the timber will go back in the rack. This time I have used a spare lathe headstock at one end (attacehd to its bed!), and a workhead bolted onto a stack of blocks at the appropriate height.

Only the top metre of the post needs to be turned in this way. To create a nice parallel top end of the post at the right diameter, a wide board is cramped parallel to the axis of the post (which is held between centres), and a sliding toolrest fabricated out of bits and pieces from around the workshop in order to hold an angle grinder with an Arbortec disk in it. This assemply then has both X and Y axis movement, with another cramp providing an adjustable depth stop.

       
This pic shows the Arbortech at work. Although the top of the post is mounted on a faceplate in the headstock, the variable speed lathe has a slowest speed of 500rpm - and this is way too fast for this huge lump of timber in a temporary bed held together with cramps! So the post is revolved by hand initially, then the forward motion of the Arbortech provides enough friction on the timber to turn the post while simultaneously reducing its diameter into a nice cylinder. It works OK.  
This pic is a close-up of the arbortech at work in its assembly on the sliding toolrest.

With this timber, I couldnt get a smooth enough finish off the Arbortech, so I decided to power the rotation of the post. With the lathe unable to turn slow enough, I used the arrangement which worked for the Hill 60 columns. I once bought an el-cheapo wood lathe at a garage sale. I kept the headstock and chucked the rest. The headstock spindle protrudes from a box which houses the motor and an enclosed 4 speed pulley arrangement. So using yet more cramps, I put this power source behind the post and had a v-belt running around its headstock spindle and then around the bottom end of the post. I set it on the fastest speed that I dared without the whole lot vibrating too much, and then was able to get a much smoother finish off the arbortech. I then used the belt sander, random orbital sander, and hand sanding to sand down the 100mm cylinder and a nice transition from the 170mm octagon poast. It is a winner!   


This pic shows the cylinder prior to motorising the post, which would prove to give a smoother finish.

Heres a shot of the motorising department. It also shows the workhead bolted to the block of timber and housed in the piece of 3/4 inch ply which was screwed to the bottom end of the post. This motorising set-up may look rough but it worked like a dream. Spinning a 3.2m long solid stick of timber in a 170mm octagon. Serious weight to it and that dinky little headstock off the cheap lathe turns it well from straight off the spindle. I only paid $20 at the garage sale for the cheap lathe too. It has paid for itself many times over!

I love this amazing and weird shot! My I-phone camera takes all these pictures. The spindle was turning at the time, so it was an action shot. I expected it to be a blurr - but instead it came out looking like a spiral!!

This is a pic of the post once the turning and sanding of the cylinder was completed. It has been sanded to about P240 grit, in the line of the grain. Nice. You can see this whole thing took place in the patio adjacent to my little workshop. Lucky it was a fine day. That is Rosemarys red stripey hammock pulled out of the way and tied to the pole. This patio is affectionately know as "The Tearooms" by us - but it is a wonderful spillover for me when I have stuff to do which is too big for my workshop! Not that Rosemary is thrilled about that...

Another view along the completed post from the bottom end.

This pic shows the transition from the 170mm octagon to the 100mm cylinder. Not bad, eh?

The next stage for newel post is the chopping of the housings for 5 of the stair treads and risers, and the housing for the top end of the bottom stringer. The housing for the bottom end of the top stringer I will chop on site after the bottom flight and the three widers have been assembled in situ. At this point the newel post will be totally fixed in position. There will be lots of fiddly stuff to make and fit on site, so I am being careful at this stage. The location of the transition point from octagon to cylinder I had calculated from the full-size drawing I did on my set-out board. ...hope I have drawn if right... Fingers crossed, eh?!

So I got on with things and was too busy to take pics as I went - I have to remember to do this as I go!
Here is a pic of the housings in the newel post for the treads and risers. From out of 5 of the 8 faces of the octabon, a tread emerges. Once this was done, there was nothing more to do on the post until I got on site.
Meanwhile, it was back onto making the bottom straight flight of stairs.

  
Here the bottom flight are cramped up. the bottom riser is not in place, as the stringers have been left an extra 10mm long, in order to scribe the base to fit the floor, which may not be level. Once the stringers have been scribed to the correct level, the riser will be cut to height and inserted prior to the bottom flight being bolted to the wall in position.

 
This pic shows the bottom flight completed ready to be taken to the job site. With the newel post done, the bottom flight completed, the material machined up for the top stringers, and the remaining treads and risers made, it was time to pack up and head south to Augusta for the installation. This was going to be a big load on the trusty ute. The other pic is a closeup of the housed treads and risers. All a very nice fit!

Like I said, it would be a load!! It rained that day with a for cast for a storm, so I had to have it wrapped up pretty well for the 320km (200mile). It was very heavy too. I cant even lift the bottom flight, but I got the whole lot loaded onto my ute, wrapped and secured before the rain arrived that morning. It was a mission. Sometimes working on your own has down sides - like when you have to load up. The ute is pictured here at the junction of Sues Road and the Brockman Highway, only about 50km from the final destination.  

Yep, it was loaded, and very heavy (did I mention that?). Fortunately, it kept dry too.

Here is the timber and components unloaded on site in the adjacent kitchen space, ready to go. In another room are the many boxes of tools, fixings and other equipment that I also had unloaded from the ute.

This pic shows where the staircase is heading!


This pic shows where the staircase begins... the hole we are going to fill. I say "we" because my wonderful Dad, who lives next door to the job site, has been itching to give me a hand. At 82, he still has heaps to teach me - though I can show him a trick or too as well these days - and we really enjoy working together. He is hard of hearing too, so that always makes it entertaining as we communicate on the job! See the floor sander, well I brought that down on the back of the ute too. First task was to sand the jarrah floor ready for the staircase to be fitted. This pic shows the end of that travel day. It begins in earnest tomorrow, with the sanding to be completed first up.

  
Here is the bottom flight in place. The floor was sanded, the bottlms of the stringers scribed and trimmed to height, and the bottom riser trimmed and fixed. Now to fit the post.

The post here has been fitted. It was like a jigsaw and had not been assembled previously. It had all be done by measurement and working off my fill sized set-out board, so I was very pleased (and relieved) that it all went together so well. Nice to no longer have to move that very heavy poast around anymore, too! Thats Dad surveying our progress.


This pic shows the tenon of the stringer and the top step of the bottom flight fitting nicely into the mortice and housings in the newel post. So satisfying when it all comes together!!

 
With the stringer and post joint pulled up, the fixings were put in place to hold it there.

The first of the winders had been fitted and the second one is about to happen. This is fiddly work, and we also first used Dads machines for a couple of hours to create the flooring which we will use on the winding steps.

Two of the winders are in, and we are working on the third and fourth. Dad here measuring the length of a riser. Framing had to be fixed to the walls to support the flooring/winding treads, so there is plenty to do!


This pic shows the winders completed. Now for the top flight!

 
The top stringers were then made, and the first of these fixed to the wall in the appropriate location.


The big tenon on the end of the centre top stringer fitted beautifully into the mortise on the newel post. With the cramp pulling the stringer tight into the joint, the measurements could be taken to cut the top flight treads and risers to length. The cramp was removed adn the top centre stringer taken down. Then each of the treads and risers were individually fitted for their housing, as they would need to each be inserted after the stringers have been fixed in their respective positions.

Meanwhile, we laminated up the two posts and the pantry door jamb. The 2 posts would be structural supports for the upper centre stringer, which transitions to a small flat landing before it meets the wall and doorway above. Dad here checking the cramps after we have done the glue-up togther. One post will be 90 x 90mm and the other 90 x 70mm, at nearly 2.7m long.

These pics show the posts in position and the top stringers in poace for a "dummy run". Check, check, then check again... once we start putting it all together there will be no turning back without major grief!

Here most of the treads and risers have been inserted and fixed in position. It was left overnight cramped in position while the glue dried. The prop against the opposite wall applied the pressure needed to keep everything in exactly the right position. Next day the remaining treads and risers, the top landing and other structural elements were completed. After the final sanding, a sealing coat was added. The treads and risers were now completed! Were not finished yet with this staircase, but we are most of the way there...

This pic shows the top flight from the corner of the first winder. Still no balaustrading, handrails or cover strips around the wall on the winders or the top landing yet. 


I am very pleased the way the winders come out so cleanly of the faces of the octagonal newel post base. It looks great and was a good way to construct it. Essentially the line of each riser face passes through the centre point of the newel post. The drawing on my set-out board was beautifully transfered into reality!
The picture on the left shows the top of the stringer against the wall terminating up in the air. The 45 x45mm cover strip referred to earlier will pick up the end of the stringer and follow the wall all the way to the top stringer, going up and along each of the winders on the way. There will be much scribing to do around the
Best selling wood projects
Read More..